Transcript
timeline for engines is somewhere along lines of call it 10 years or more.
And so this accelerates that.
But then beyond that, they will be benefiting from fireflies R&D.
And then of course, they'll be developing their own IP as well.
People who understand rockets, understand that.
The engine is the most critical and the most difficult thing to do.
And then, you know, for AST, they will be leveraging learnings and what have you
to develop what they believe will be a fully reusable rocket, maybe the first flight by the end of 2028.
So let's probably push that back to 2029.
But I think, you know, obviously the company did this because they are looking down the barrel of a bunch of demand for what they're doing.
And as a result, they need to secure launch, right?
There needs to be an ability to tell customers that in the future,
when you have multiple shells that are that need to go up, you can deliver on that, right?
And so interestingly, I pointed this out in a tweet, this rocket is going to be called black lift.
It's not going to be called blue lift.
The reason why I think personally, they're calling it black lift is that there's probably going to be black birds, right?
For US government work, whether it's dual use with an existing commercial satellite or a dedicated shell of government satellites,
which I think now it all kind of makes sense.
I believe, you know, we have another 400,000 square feet in midland that got approved for expansion.
And so putting aside the 500,000 square feet we already have for satellite production, my guess now is that that additional space is going to be dedicated to more satellites, but also rocket development, right?
But going back to what I was saying before, why would the company do this?
And of course, when I first saw this, you know, some space mob, we've been kind of digging around and kind of were getting hints that baby, this was something possible.
And so, you know, we debated, you know, what was the purpose of it?
And of course, when I hit the tape today, we were, of course, fries.
But I think, you know, when you take a step back, there's a lot of questions here, by the way, like there's there's certainly risk, right?
And I'll go through those. But when you think about the long term of what the company needs to do and deliver, you need a shared access to space, which I think going back to 2022, 2023, 2024, all those years.
And for the most of 2025, I think, I think the view on launch capacity was pretty, you know, was pretty positive, right?
But it wasn't until the advent of Orville's data centers came into play, where now there's this focus on putting compute into space.
Now capacity looks not as interesting, right? Not the potential rights to space could be constrained to some extent, right?
And so you as a company, if you're delivering a program that's in demand by M&O's globally by governments, there's a lot of stake, right?
And so I think the, the idea that Starship and Blue Origin New Glenn are going to launch on a weekly and monthly basis like, or monthly weekly and then day by day basis, I think that's a really interesting concept.
And hopefully they'll get there. But also, if you're a company that needs to deliver a consolation and multiple constellations on given time, you can't, you can't be kind of at the whims of those rocket programs, getting there and or they continue, you know, those programs being friendly versus trying to put up a competing, you know, consolation, right?
And so, so I think with all those things in mind, having the ability to bring a program in house and create a dedicated vehicle just for, you know, a simple vehicle, if there ever is a simple rocket.
But one that's not, you know, configured to go to the moon or go to Mars, but it's it's sole job in a cost effective way is just to deliver your satellites to Leo, right?
And so I think it's, it's just ready to point out that the company is, you know, this is not a rocket that that they're not looking to open this up to customers or any of that.
And you can see that with Firefly where, you know, they're not competing. They, there's so much demand that they need it for their own satellites, which is a good thing, right.
And so the company taking this move from my understand it has been in the works for quite some time and and I think the messaging previously is that, you know, they, they obviously are going to leverage multiple launch vehicles, which they will continue to do.
I think an important aspect from this press releases that they have secured launch for 100 satellites over 2027 and 2028.
The other interesting thing that I would point out is they now have a deep pass rating. And so this is very important.
For those that don't know, this is something that Kuk had been talking about. He was actually talking about a different program, but it's similar where he was saying maybe AST will get an NSL rating.
But here, we are now coded for defense priorities and allocation system. This is something that is an is an act that was developed over World War II and it gives priorities to programs for national security reasons. And so we actually have that now.
And so what why that is important is that for these 100 satellites from 2027 to 2028. Once we do get a government program of record where the government says, hey, we want your services and here's money, not, not just like, you know, some initial exploratory stuff, which the company has multiple programs that are in the works, but the company now by getting this deep pass rating.
The US government is basically telling you you're in line to get award work. And when you do a deep pass rating means that your satellites go to the front of the queue ahead of commercial car goes.
Right. And so you obviously need to get an award for that. But now that we have a rating, I think that pretty much tells you that those awards are coming yesterday.
We announced this expansion of the word for radar and sensing with with the space force. And so that was based off of 900 beggars testing that we had done space mom had covered that over the last few months, but things are accelerating.
Right. And so from what I understand, there's a lot of support in the US government. And you wouldn't take on a, you know, trying to develop a rocket.
Obviously in partnership with firefly, but you wouldn't do that unless you felt confident that there's a lot of big work that's coming that's going to be funded and, and you know, you expand floor space.
I think as we all know, the US government, and this goes this whole truth to it's not just US, but it's also Europe, Japan, Latin America.
Everybody is looking to diversify and have options away from starlink. And so if anything, I think this is probably the most explicit, you know, qualified or explicit hint of that right because the company, if you think about their ability to go to governments, you know, beyond the first 100 satellites.
Where things are they can be uncertain, you have to have the ability to go to governments and MNOs and say, hey, we are confident in delivering these out lights to space. And if you're going to do a low ban shell, a mid ban shell, high ban shell, and then, you know, a government shell, that's a lot of satellites, right. And so it does make sense.
And so it's really important to think about the future to invest in capacity where you get owner economics and you have more importantly the ability to, or just as importantly, to deliver on what you say you are, right.
Instead of, you know, being at the whims of of in SpaceX's case, you know, if there's certain things that they want to do and it's not compatible with what commercial companies want or NASA, you're not kind of at the whims of just one provider.
The other thing is that this will, you know, this gives them the ability to then when you negotiate with launch providers, it enables you to have a bit more leverage. Now, obviously, that leverage is is it increases a little bit today, but then maybe a year, two years from now, it will increase further.
And this is an option, right. This is an option where they're it's not as if you're building a rocket from scratch. You're actually writing the already laid out, you know, development plans from another company and you're you're putting money into that you're helping them and you're getting to the pad faster, right.
And in this particular case, you're building a rocket that's purpose built. It's not designed to take other payloads or but it's going to be solely for your satellites. So, you know, as I said before, I think I think the the dynamic that changed for the industry is is putting orbital compute into space. And so one of the things that I think SpaceX said.
The issues that SpaceX had had before was that, you know, they're when they had first developed their rocket, there was no cargo to take up space, so then they had to expand into.
They had to expand into, you know, starlink and creating their own car. So now that you have orbital compute that that's a pretty big level of demand, right. And so I think that uncertainty.
And then coupled with the fact that you again, you've got governments around the world who want alternatives, MNOs as well.
You have to have the ability to get your satellites to space, whether that's through the 100, the launches for 100 satellites that are contracted over the next two years, which is coming as locked in, but also developing a program in parallel, right, which will de risk your ability to get more satellites up.
Let's see here, I'm going to talk about go through some of these notes. So as I mentioned before, this black this black lift is going to be a simple design.
There will be no other mission except for delivering bluebirds to lower orbit. It's not going to be a rocket that is designed to go to the moon or to Mars, it has one job and one job, only to deliver bluebirds to Leo and then return.
Let's see, as I mentioned before, you know, the company is piggybacking development already already that has been invested by Firefly, they're getting their licensing IP to make engines.
And yeah, I mean, that's the most difficult part. Now the risk, of course, let's let's talk about some of the issues, right.
The risk is that we know rocket programs are difficult to take time and they also require money, right. And so we are paying upfront money for the IP and ongoing services and development, but it's going to require money over time.
So a key question that I think people have is where is the money coming from, right. And so I think key thing is that once you get, once you get service up and running and you've got with the existing launch agreements to get hundreds of lights of space, then things start to become self funding, right.
And that's part of it, but that's going to take time. The other aspect is if you're getting a deep pass ready for the government and you're getting these awards sooner or later, those awards are going to turn into multi hundred to potentially multi billion dollar programs, right.
I think the company has talked about defense this year, potentially being several or this coming year, 2027 being several hundred million dollars. And so I think, you know, putting aside, or I guess we should talk about the political landscape too.
I think there is going to be a big push to diversify look at different providers that are alternatives to SpaceX, right. And specifically for Starlink and Starsheald.
And so I think the funding for this program is likely over time going to be subsidized by government, government work, right. And so yes, it is a, it is a constraint, but I think I think the, you know, I got to run through the month, the model for this, but you do have to think about the upfront development costs and
the ongoing, but then weigh that against, you know, so it's going to cost money to develop a rocket, right. And this is the build versus buy analysis.
But on the flip side, you get owner economics, right. So if Falcon 9 costs sticker price now, what 80 million dollars, but internally it's the cost is 13 million.
How much do you save per launch, right. And so it'll be interesting to see maybe they'll cover this at the presentation next week, but what ultimately is going to be the potential cost per launch. And then, you know, I guess one key question I would have is the blue bird, right, like once you're beyond the upfront cost is the blue, the cost per blue bird, does that materially change, right.
Does it go from, I don't know, 20, let's just call it like 26 27 million dollars for block two blue bird, does that go down to 20 or 18 or 19.
So yes, there is money that's going to be required to develop the program, but then on an ongoing basis in terms of variable cost.
How much do you lower the cost of launch, right, for each blue bird. And so that'll be an interesting question.
But yeah, I think, you know, the ability to have line of sight for launch beyond 2028 to have, you know, by the way, I don't think the company is going to fully depend on this black lift rocket for all their launches, like if you can, if you think about what Amazon is doing where they are launching on SpaceX, they're launching on ULA and of course Blue Origin.
The view is to have a diversity of watch, right, so you're not fully dependent on on one person.